Project

Images

Spectrum Terrace (Phase I)

Irvine, CA

Close Up

  • Owner/Developer

    The Irvine Company

  • Architect

    Pei Cobb Freed & Partners Architects

  • Engineer

    Nabih Youssef Associates

  • Façade Consultant

    JA Weir Associates

  • GC

    Hathaway Dinwiddie Construction Company

  • Completion

    2019

  • Building Type

    Office

  • LEED Rating

    Seeking Gold certification

  • Program

    4 stories (63ft), 343,200 sqft

  • Façade Area

    145,200

Materials

Systems

Processes

Detail

Spectrum Terrace is an ultra-modern commercial office campus spread across 73 acres of natural landscape that will ultimately see nine 4-story office structures built. Enclos was contracted to complete the first phase of campus construction, including five buildings: three 100,000+ square-foot office buildings, an 8,500-square-foot amenities and fitness building, and a 5,500-square-foot amenity building.

The office buildings are characterized by 40’ column bays that are enclosed with floor-to-ceiling glass created by the 10’-0” wide by 14’-6” tall prefabricated curtainwall units. At the fourth floors, these units grow to an impressive size of 10’-0” wide by 18’-6” tall. The curtainwall system features vertical blades and horizontal covers with a striking polished anodized finish. Each office building is accented by two 40’-0" wide metal canopies that project 15’ beyond stainless steel-clad balanced doors at the main entries. Sliding doors, also clad with stainless steel, provide tenants with access to terrace amenities.

At the amenities buildings, 20’-0” wide by 10’-0” tall operable hydraulic doors create a seamless connection between indoor and outdoor spaces. A fritted glass skylight system provides cover to a dining patio and lounge space.

The campus is targeting LEED Gold certification.